IDA413 Intelligent Drilling and Arch Integrated Engineering Vehicle
Go Anywhere, Anytime
Best transportability and road passability, all-weather work.
Easy To Operate
Highly intelligent integrated control system, easy to understand.
Safe And Reliable
Ultra-high quality standards to ensure product safety and reliability.
Low-Cost, High-Efficiency
Reduce customer production costs and improve production efficiency.
IDA413 Intelligent Drilling and Arch Integrated Engineering Vehicle
Go Anywhere, Anytime
Best transportability and road passability, all-weather work.
Easy To Operate
Highly intelligent integrated control system, easy to understand.
Safe And Reliable
Ultra-high quality standards to ensure product safety and reliability.
Low-Cost, High-Efficiency
Reduce customer production costs and improve production efficiency.
Go Anywhere, Anytime
Best transportability and road passability, all-weather work.
Easy To Operate
Highly intelligent integrated control system, easy to understand.
Safe And Reliable
Ultra-high quality standards to ensure product safety and reliability.
Low-Cost, High-Efficiency
Reduce customer production costs and improve production efficiency.
Higher Safety and Lower Production Cost
Main Features
- IDA413 intelligent drilling and arch integrated trolley is a double rock drilling and a vertical arch integrated trolley that meets the needs of tunnel full-section and step method construction. Basket structure, with four-wheel steering, four-wheel drive, two-way driving, and other functions,
- Electric construction, diesel emergency. Convenient operation, low failure rate, high reliability, compact structure, convenient maintenance, and beautiful appearance.
- Functional integration: construction of excavation holes and anchor holes, arch installation, powder charging, anchor installation, anchor grouting (optional), anchor net installation, and other multi-functional integration.
- Equipment informatization: including cluster management, positioning function, video surveillance, walkie-talkie function, pre-alarm function, data management function, tunnel BIM technology, and digital production, construction report management, tunnel outline scanning, remote control, and other functions.
- Wide range of applications: three steps, two steps, full section, meeting the requirements of various construction methods for rock drilling and arch construction.
- Efficient rock drilling and vertical arch: double triangle self-balancing rock drilling system, rapid positioning of rock drilling; two arms and three grippers, multi-degree-of-freedom manipulator, the maximum lifting force of the arm frame is 2.5 tons, full prefabricated arch installation and accurate positioning of the arch It takes about 1 hour to adjust and erect all construction work seats
- Patented double sliding: the company’s unique double sliding mechanism, the sliding is stable and fast.
- Double hanging baskets: the main and auxiliary vertical arch arms are equipped with expandable hanging baskets, and the bolts and auxiliary charges are installed after drilling.
- Convenient operation: local console operation + remote control operation, satisfying the height viewing angle when drilling rocks, and meeting the close-range viewing angle when arching.