E-mail: [email protected]     WhatsApp/Tel: +86 18308464822

POŽÁDEJTE O NABÍDKU

Wind Turbine Installation Platform / Wind Turbine Installation Vessel (WTIV)

Rychlý náhled informací o produktu

· Stav vybavení

zbrusu nový

· Přizpůsobitelná situace

Ano

· Cenové rozpětí

obchodovatelné

· Primární oblast použití

offshore engineering

popis

The wind turbine installation platform is primarily used for offshore wind farm turbine installation and offshore construction operations involving lifting and floating crane work. The platform is capable of carrying and installing mainstream offshore wind turbines of 6 to 8 MW and below. It supports lifting operations for offshore 8 MW wind power installations, as well as other marine construction tasks such as lifting, piling, hoisting, and transportation. The platform can perform installation of various foundation types including monopile foundations, jacket foundations, multi-pile cap foundations, and bucket foundations for offshore wind turbines. Additionally, it enables pre-assembly of wind turbine rotor blades on deck and offers repositioning capabilities within the operational water area. Key equipment on the platform includes large-scale wind turbine installation cranes and continuous hydraulic locking pin lifting systems. To date, the company has successfully designed, built, and delivered the country’s first 1200-ton self-propelled jack-up wind turbine installation platform.

galerie obrázků

Specifikace

ParameterSpecification
Lifting Capacity1200 t
Overall Length~132.8 m
Length Between Perpendiculars103.8 m
Molded Beam41.0 m
Molded Depth8.2 m
Max. Operating Depth (incl. tide)50 m
Design Draft~5.2 m
Crane Operation Draft~5.5 m
Speed≥7.0 kn
Dynamic PositioningDP-1
Endurance20 days
Crew Capacity100 P
Number of Legs4
Leg Length85 m

Aplikační průmysl a materiály

Zákazníkům se také líbí