Appreciation of 600 tons of sand and gravel aggregate project
July 2, 2023 Hawk
Chengdu Shangyi Building Materials Co., Ltd. and DHL have built a 600-ton-per-hour sand and gravel aggregate project in Chengdu, Sichuan. The finished product is used for high-speed rail construction. The project officially started on May 2021. At present, it’s working good
In terms of environmental protection and intelligence, the project is equipped with a water circulation system to realize the recycling of sewage; the project is equipped with a PLC intelligent control system for intelligent management and control, escorting the safe, stable, and efficient operation of the project
Project Overview
Raw material: pebbles
Output: 600t/h
Area: 40 acres
Production process: wet sand making
Finished product specifications: natural sand 0-5mm, machine-made sand 0-5mm, 5-9mm, 9-16mm, 16-30mm
Application market: high-speed rail construction materials
The project site
The project purchased two sets of DHL cone crusher PYY300, two sets of jaw crusher PEV500*750, two sets of jaw crusher PEV950*1250, impact crusher 8HL1280, six sets of sand washing machine LX1500, three sets of dehydration recovery integrated machine HS3060 and other crushing and screening equipment.